Signal House Group Limited
  • Signal House Group Limited
    • Signal House Group Assurance
    • Group Brochure
    • Michael Evans & Associates
  • Collis Engineering Limited
    • Hinged Lightweight Signal Post
    • Signal Posts
    • Cantilevers
    • Signal Gantries
    • Hinged Antenna Mast
    • Location Platforms
    • Mechanical Signals
    • Points Fittings & Infrastructure Components
    • Lookout Platform
  • Signal House Limited
    • LED Colour Light Signal
    • LED Miniature Alphanumeric Route Indicator
    • LED Banner Retro-Fit Kit
    • LED Miniature Banner Signal
    • LED Banner Repeater Signal
    • Simulated LED Headlight
    • Terminal Blocks
    • Signal House LED Illuminator
  • Collis Civil Engineering
    • Site Survey & Ground Investigation
    • Concrete Foundations
    • Piled Foundations
    • Structure Installation
    • Structure Refurbishment
  • Latest News
  • Gallery
  • Vacancies
  • Contact Us
Select Page

Gallery

View all of our galleries here.

Mornington Crescent – HS2 Enabling Works

Mornington Crescent – HS2 Enabling Works

Filton

Filton

Signal Post Installations

Signal Post Installations

Hinksey Flood Alleviation Works

Hinksey Flood Alleviation Works

Droitwich

Droitwich

Waterloo

Waterloo

Ayr

Ayr

Mid Calder

Mid Calder

Dawlish

Dawlish

  • Download Brochure
  • Signal House Group Assurance
  • Visit Michael Evans and Associates
Home | Contact Us | Privacy Policy
© 2020 Signal House Group Limited. All Rights Reserved.