Filton
Collis Engineering and Collis Civil Engineering were contracted to provide a full turnkey service for the Filton Bank project. The scope included Surveying, Foundation Design, Manufacture & Installation. Superstructure Manufacture and Structure Installation.
The structures required were
- 20m, OLE compliant Signal Gantry, inclusive of 3 signal dropper cages.
- 10m, OLE compliant Signal Cantilever, inclusive of 1 signal dropper cage and 1 leg mounted signal. Access was provided by a walkway and stairs.